Day 4
Sat, Oct. 17, 2020
Hot Air Balloons, Hike, & Durango & Silverton Narrow Gauge RR
![]() |
| Here's the open field where a dozen hot air balloons will be taking off. |
These next videos show the XTO Energy balloon preparing for lift off.
Length: 00:00:30 sec.
Length: 00:00:36 sec.
Length: 00:00:30 sec.
And now for some other balloons doing the same thing;
preparing for lift off.
Length: 00:00:15 sec.
Length: 00:00:27 sec.
Jan saying, "No"
Length: 00:00:15 sec.
"So colorful."
Length: 00:00:11 sec.
"All in Jeff & Michelle's backyard...all this excitement."
Length: 00:00:18 sec.
Trail on the ridge line overlooking Durango
Now it's time for TRAIN TIME!
Taking the Durango & Silverton Narrow Gauge RR
![]() |
| We arrived at the station as the diesel engine was making its wye around the train. |
![]() |
| Tried to zoom in a bit closer... |
![]() |
| Inside coach car #7. |
![]() |
| Making our first turn round the out-cropping. You'll be able to see this part better on our return. |
![]() |
| The Animas river far below. |
![]() |
| You can see the beauty of the leaves and scenery here. |
The following videos used to enhance the still pictures
Length: 00:00:11 sec.
Length: 00:00:13 sec.
We've reached our destination...Cascade
Now we take the wye to return back to Rockwood.
Length: 00:00:09 sec.
Still going backwards on the wye
Length: 00:00:07 sec.
![]() |
| Cascade Station. |
![]() |
| We stopped here on the way up to load the steam engine with water. |
Length: 00:00:07 sec.
More letting off steam...
I was so glad to capture this steam moment.
Length: 00:00:09 sec.
On the way out we were on the river side.
Now we're on the rock wall side.
We do get rather close, but not too close.
Length: 00:00:20 sec.
I thought this was cool going by some implements in the yard...
Length: 00:00:29 sec.
![]() |
| I wanted to look up at the hard rock wall. |
![]() |
| What it looks like looking up from the coach car. |
![]() |
| Pretty close to the granite rock walls - but not too close. |
Now we've crossed the river so the river is now on our left.
Length: 00:00:13 sec.
Some amazing footage of the step drop off.
"EEEE, does that look scarey or what?"
Length: 00:00:31 sec.
Going slow along the narrow ledge.
Length: 00:00:06 sec.
Approaching the outcropping I mentioned
at the beginning of the run.
Length: 00:00:13 sec.
![]() |
| Jeff and I both thought this would make a good scene to capture. |
![]() |
| More wood parts used for land fill. |
This may take your breath away...so be careful...
Length: 00:00:09 sec.
Getting closer to what we talked about...
Length: 00:00:24 sec.
This video really captures the part I mentioned
in the beginning of our trip.
Great video for design and engineering required
for this railroad to be built.
Length: 00:00:30 sec.
![]() |
| Some RR rails along the way. |
![]() |
| Coming into the station we go by the switcher diesel locomotive. |
![]() |
| Coming into the station you can see my rental car. It's the first silver car after the three SUVs on the left. |
![]() |
| We had a great ride on the D&S NG RR |
![]() |
| We took a double selfie! I'm looking at Jeff's phone and Jeff is looking at my phone. |
![]() |
| Engineer greets his fans. |
![]() |
| Nice 3/4 view. |
![]() |
| Head on view. |
Had to stop short because of other vehicular traffic.
Length: 00:00:03 sec.































Oh dad!! That’s so fun!!! I love your shirt!!!
ReplyDeleteWoW!!!! I loved the steam video and got the heebie geebies looking down on those cliffs!!!! So beautiful!
ReplyDelete